Major bulk earthworks package for the new Amrun Bauxite Mine incorporating over 4M m3 of engineered fill placement including:
- Construction of access and servicing roads
- Construction of heavy vehicle haul roads
- Construction of engineered truck dump facility including reinforced earth wall
- Detailed excavation and structural backfill of beneficiation plant
- Construction of bauxite stockyard and rail transport system to export wharf
- Construction of 3M m3 tailings storage facility – over 4km of underground service installation
- Installation of corrugated metal pipe and precast concrete culverts
- Construction of sedimentation ponds
- Polymer and cement stabilised bauxite
- Detailed drainage excavation and;
- Seeding, hydro-mulching and rehabilitation