Construction of new Tailings Storage Facility (TSF6) including;
- Over 200Ha of clearing and grubbing
- 500,000m3 of topsoils stripping
- 1.5M m3 of sand fill embankment construction
- 7km of subsoil drainage and seepage collection system and installation of 9 sumps
- Construction of 7km of access road and pipe trace
- Installation of embankment monitoring instrumentation
- Installation of reinforced box culverts
- Construction of Causeway and HDPE lined decant structure
- Reshaping and clay lining existing borrow pit
- Supply and installation of HDPE Ring Main pipe
- Supply, Installation and commissioning of Decant pumps and miscellaneous mechanical items.