IRON BRIDGE MAGNETITE PROJECT – RAW WATER PIPELINE

Project Information

Client: Fortescue Metals Group (FMG)
Start: October 2021
Completed: Scheduled June 2022
Contract Value: $12,000,000
Location: Iron Bridge Mine, Marble Bar, WA

Description

The portion of the Iron Bridge project is for the development of Raw Water pipeline infrastructure which is located in the Canning Basin, South of Pardoo Roadhouse and heads South-West towards Iron Bridge mine in the Pilbara region of Western Australia.

The overall scope of the project includes the civil enabling works required to be completed at the Iron Bridge Magnetite Project for the raw water pipeline and supporting infrastructure, including:

  • Clearing and Grubbing, Topsoil Stripping and Foundation Treatment
  • Drill and Blast, including blasting the trench alignment
  • Cut to Fill operations levelling the Construction Right of Way (CROW)
  • Trimming batters
  • Trimming subgrade