Project Scope

QH&M BIRT was engaged to construct a new three-cell Tailings Storage Facility to accommodate increased FIM process plant throughput and support the long-term operation of the asset.

Project details

Key Features:

  • 49Ha of clearing and mulching
  • 1.6M m3 of topsoil and subsoil removal
  • 2.8M m3 of engineered embankment construction
  • Construction of detailed subsoil drainage systems including 100,000m3 of filter and erosion protection material placement and 60km of subsoil drainage infrastructure
  • Construction of surface drainage
  • Installation of Company supplied HDPE Piping

We do what we say we’ll do, giving our clients confidence from concept through to completion.

Delivery Highlights

Capturing the scale, complexity and quality of delivery at every stage.

Get in touch with our leading civil construction team today

Whether you’re a professional in our field looking to embark on a truly rewarding career, an existing client who wants to get started on a new project or you’re a potential client looking to learn more — get in touch with our team today. We’d love to hear from you.