We are aware of a scam email pretending to be from Q H & M Birt – DO NOT reply to the email or call the phone number listed. If you need to get in touch, please contact us directly.

Fimiston III TSF Project

QBirt

Scope of work

Construction of a new 3 Cell Tailings Storage Facility to support the increased FIM process plant throughput and extended life of asset.

Works Include:

  • 49Ha of clearing and mulching
  • 1.6M m3 of topsoil and subsoil removal
  • 2.8M m3 of engineered embankment construction
  • Construction of detailed subsoil drainage systems including 100,000m3 of filter and erosion protection material placement and 60km of subsoil drainage infrastructure
  • Construction of surface drainage
  • Installation of Company supplied HDPE Piping

Current Project

Get in touch with our leading civil construction team today

Whether you’re a professional in our field looking to embark on a truly rewarding career, an existing client who wants to get started on a new project or you’re a potential client looking to learn more — get in touch with our team today. We’d love to hear from you.