We are aware of a scam email pretending to be from Q H & M Birt – DO NOT reply to the email or call the phone number listed. If you need to get in touch, please contact us directly.

Hope Downs 1 Sustaining Project

QBirt

Scope of work

Development of two additional ore bodies, Bedded Hill Top and Hope Downs 2 as well as a Long Term Road Train route to sustain production from the HD1 Operation.
Works Include:
  • Clearing, grubbing and stripping of HD2 and BHT IMA Pits, Waste Dumps and Stockpile Areas.
  • Construction of HME Haul roads and LME Haul roads to facilitate initial mining of HD2 and BHT Pits.
  • Construction of Satellite and Permanent NPI pads.
  • Construction of Transfer Pads and Skyway.
  • Surface water management including CSP supply and installation, construction of diversion drains.
  • Construction of 22.8km of stabilised and sealed permanent haul road from HD2 to existing HD1 operations for long term road train mining.

Current Project

Get in touch with our leading civil construction team today

Whether you’re a professional in our field looking to embark on a truly rewarding career, an existing client who wants to get started on a new project or you’re a potential client looking to learn more — get in touch with our team today. We’d love to hear from you.