Project Scope

QH&M BIRT was engaged for the construction of an earthfill buttress to the existing Cell 1 Tailings Dam, enhancing the stability and long-term performance of the facility.

Project details

Key Features:

  • 50,000m3 of topsoil stripping and vegetation removal
  • Placement of seepage blanket under buttress embankment including finger outlet drains
  • 300,000m3 of engineered buttress embankment construction including access ramps and safety bunds
  • 20,000m3 of Decant rockfill construction over existing decant
  • Construction of new spillway basin including grouted rock protection
  • Construction of over 500m of subsoil drainage system including trench excavation, bedding, HDPE pipe installation and sump outlet construction and connection

We do what we say we’ll do, giving our clients confidence from concept through to completion.

Delivery Highlights

Capturing the scale, complexity and quality of delivery at every stage.

Get in touch with our leading civil construction team today

Whether you’re a professional in our field looking to embark on a truly rewarding career, an existing client who wants to get started on a new project or you’re a potential client looking to learn more — get in touch with our team today. We’d love to hear from you.