QH&M BIRT was engaged for the 11-kilometre realignment of the Bruce Highway between Cooroy and Curra, delivering critical infrastructure to improve safety, connectivity and traffic flow.
Project details
Key Features:
116Ha of clearing and grubbing
230,000m3 of Topsoil Stripping
230,000m3 of excavation to spoil
Over 3M m3 of engineered embankment and rockfill
Construction underdrainage structures including detailed excavation, geosynthetics and rock fill installation
We do what we say we’ll do, giving our clients confidence from concept through to completion.