Construction of multiple tailings dam wall raises to the RMA storage facility including;
- Over 700,000m3 of engineered zoned embankment and road construction
- Construction of sand chimney and blanket seepage collection system
- Construction of concrete spillway
- Detailed excavation of diversion drains
- Relocation of existing deposition piping system